SDG Lines, home

SDG Lines is an educational simulation. It does not provide real transport services.

Cargo services

Project cargo

Out of gauge, heavy lift and breakbulk shipments carried on flat racks and roll trailers where no closed unit will do.

About this service

Project cargo is anything that will not fit in a standard container: too long, too wide, too tall or too heavy. Transformers, boat hulls, industrial plant and wind components all fall into this category.

Each project shipment is planned individually. There is no standard rate, because the cost depends on how much space the cargo denies to everything around it and on what has to be arranged to load and secure it.

What to get right

You pay for the space you block, not the space you fill

Cargo overhanging a flat rack makes the neighbouring slots unusable. A shipment that is 30 centimetres too wide can cost as much as one that is a metre too wide, because in both cases the slot beside it is lost.

Lifting points and weight distribution matter early

How the cargo will be lifted, where the load bears on the flat rack and how it will be secured are questions that have to be answered before the booking, not at the terminal gate. A lashing plan is often required.

The inland legs are usually the constraint

A cargo that fits on the vessel may still not fit under a bridge on the way to the port. Route surveys for the road legs are part of planning a project shipment, and they frequently determine which port is used.

Equipment used

The units most often chosen for this cargo. The full catalogue has the rest.

Equipment commonly used for project cargo
Unit ISO code Internal L × W × H Tare Max payload Capacity
20' flat rack 22P1 5.62 m × 2.21 m × 2.21 m 2,900 kg 30,100 kg —
40' flat rack 42P1 11.83 m × 2.23 m × 1.96 m 5,700 kg 39,300 kg —
62' roll trailer Not standardised To be confirmed To be confirmed 80,000 kg —
Full equipment catalogue →

Routes that accept this cargo

Ports that handle it

16 of the 41 ports in the network handle this cargo type.